Line 10 (Madrid Metro)

Line 10 (Madrid Metro)

Line 10 of the Madrid Metro is in fact the product of two lines, the former line 8 from Fuencarral to Nuevos Ministerios and the former Suburbano (also known as Line S) from Alonso Martínez to Aluche, this section being named line 10 in the 1980s. In the 1990s, Madrid planned for these two lines to become one, but there was a problem. Line 8 was large profile and Line S was Small profile, so Madrid decided it was going to rebuild the Suburbano section to fit large profile rolling stock, a feat that took five years to complete. During this process, all island platforms were demolished, tunnels were widened, platforms cut back and stations modernised. Also a new section between Alonso Martinez and Nuevos Ministerios had to be built, with an intermediate station at Gregorio Marañón. Finally once this was all finished, the whole line could use large rolling stock and the line was extended from the New Casa de Campo to Colonia Jardín. The section between Casa de Campo and Aluche was handed over to line 5 which now terminates at Casa de Campo.

On 11 April 2003, Line 10 was extended to Puerta del Sur where it meets Line 12 (also known as Metro-Sur). The last two stations on this extension are in fact outside Madrid and in the town of Alcorcón. Joaquín Vilumbrales is also unique to this line and it is one of the few stations to have an island platform instead of side platforms. On the 22 December 2006, Aviación Española was opened on the existing line between Colonia Jardín and Cuatro Vientos. This station was opened to serve the nearby Aircraft Museum, which the station is named after. On 26 April 2007, the line was extended north from Fuencarral to Hospital del Norte (Hospital Infanta Sofía as of August 2008). The station after Fuencarral, Tres Olivos is a transfer station between the regular Line 10A, and Line 10B, which is the part between Tres Olivos and Hospital Infanta Sofía. The line links the towns of Alcobendas and San Sebastián de los Reyes with Madrid. Proposed plans for Line 10 include the building of a new station between Colonia Jardín and Aviación Española called Dario Gazapo. Also there are plans to extend the line from Puerta del Sur to Mostoles Central and further onto the new Xanadu Shopping Centre. However this is unlikely because Metro Sur already reaches Mostoles from Puerta Del Sur, but via Alcorcón.

Line 10A uses 6-car trains of class 7000, and line 10B uses 3 car trains of class 9000.


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Line 8 (Madrid Metro) — Line 8 of the Madrid Metro opened between Mar De Cristal and Campo de las Naciones on 24 June 1998. An extension to Barajas via Madrid Airport was opened in 1999 and in 2002 an extension to Nuevos Ministerios and Colombia opened. Originally this… …   Wikipedia

  • Line 7 (Madrid Metro) — Line 7 of the Madrid Metro originally opened on 17 July 1974 between Pueblo Nuevo and Las Musas. On 17 May 1975, the line was extended from Pueblo Nuevo to Avenida de América and for many years, this remained the length of Line 7. This was a… …   Wikipedia

  • Line 4 (Madrid Metro) — Line 4 of the Madrid Metro was opened on 23 March 1944 between Goya and Argüelles. In 1958, the line took up a branch of line 2 from Goya to Diego de León, which originally opened on 17 September 1932. In the 1970 s, the line was extended in two… …   Wikipedia

  • Line 12 (Madrid Metro) — Line 12, also known as MetroSur, is a line of the Madrid Metro. Opened on 11 April 2003, Line 12 is a circular line that is not in fact in Madrid, but links five suburbial towns and one small village south of Madrid, serving around 1 million… …   Wikipedia

  • Line 11 (Madrid Metro) — Line 11 of the Madrid Metro opened between Plaza Elíptica and Pan Bendito on 16 November 1998. For eight years it had only three stations. In 2006 the line was extended from Pan Bendito to La Peseta with two intermediate stations. Line 11 however …   Wikipedia

  • Line 6 (Madrid Metro) — Line 6 of the Madrid Metro opened originally between Cuatro Caminos and Pacifico in 1979. This is one of two circular lines in Madrid, but unlike Line 12, it did not open as a full circle. The circle was completed in 1995, taking four stages from …   Wikipedia

  • Line 1 (Madrid Metro) — Line 1 of the Madrid Metro was opened on 17 September 1919 between Cuatro Caminos and Sol. It was extended from Sol to Atocha in 1921, Atocha to Puente de Vallecas in 1923, Cuatro Caminos to Tetuán in 1929, Tetuán to Plaza De Castilla in 1961 and …   Wikipedia

  • Line 2 (Madrid Metro) — Line 2 of the Madrid Metro was opened on 11 June 1924 between Sol and Ventas. It was later extended fron Sol to Quevedo on 27 December 1925 and from Quevedo to Cuatro Caminos on 1 September 1929. In 1932, a branch from Goya to Diego de León was… …   Wikipedia

  • Line 3 (Madrid Metro) — Line 3 of the Madrid Metro was opened in August 1936 between Sol and Embajadores, a few days before the beginning of the Spanish Civil War. In 1941 it was extended from Sol to Argüelles, in 1949 from Embajadores to Delicias, in 1951 from Delicias …   Wikipedia

  • Line 5 (Madrid Metro) — Line 5 of the Madrid Metro originally opened between Callao and Carabanchel on 5 June 1968, the latter sharing station platforms with then called Line S (for Suburbano ) On 2 March 1970, the line was extended from Callao to Ciudad Lineal, however …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”