Value of lost load

Value of lost load

The Value of Loss Load (VoLL) is the estimated amount that customers receiving electricity with firm contracts would be willing to pay to avoid a disruption in their electricity service [ Vassilopoulos, P., “Models for the Identification of Market Power in Wholesale Electricity Markets”, Industrial Organization, D.E.A 129, September 2003 pp 46 - 47. ] . The value of these losses can be expressed as a customer damage function (CDF). A CDF is defined [Sullivan, M.J. and Keane, D.M., “Outage Cost Estimation Guidebook”, EPRI Research Project 2878-04 Final Report, December 1995, pp 1-4.] as:

Loss ($/kW) = f(duration, season, time of day, notice)

Based on the calculated outage cost, a CDF can be obtained for various customer groups. Typically, there are three distinct groups of customers: residential, small and medium commercial/industry and large commercial/industrial [ Sullivan, M.J. and Keane, D.M., “Outage Cost Estimation Guidebook”, EPRI Research Project 2878-04 Final Report, December 1995, pp 8-13.] . Figure 1 below illustrates the incremental CDFs of these three groups.

The CDF relates the magnitude of customer losses (per kW interrupted) for a given duration of a power outage. While the general shapes of all three curves are similar, the magnitude of loss varies dramatically depending on the customer’s size. Based on VoLL data from an EGAT survey in March and April 2000 [“Electricity Outage Cost Study”, http://www.eppo.go.th/power/ERI-study-E/ERI-ExeSummary-E.html, 19 November 2005.] , it was estimated that the customers’ costs in the first hour for residential customers was Baht 11.45/kW. For large C/I and small & medium C/I customers, the cost in the first hour was Baht 29.55/kW and Baht 89.50 /kW respectively. Another research from EPRI indicates that residential customers’ cost tend to peak at USD 1.50/kW in the first hour and falls of to USD 0.46/kW in subsequent hours. On the other hand, large C/I and small & medium C/I suffer much higher losses of USD 10/kW and USD 38/kW respectively in the first hour. This falls to USD 4/kW and USD 9/kW respectively in the subsequent hours.

The CDF predicts the loss per interrupted kW based on factors that influence the outage. The CDF is usually calculated based on defined market segments such as residential, commercial, and industrial. This is done because there are large variations of costs across the utility market segments. However, in a large area it is a normal practice that the interruption cost is aggregated to represent a general picture of the load losses. The aggregated interruption cost is called the composite CDF.

References

External links

* [http://www.daniel-sen.com/uploads/MEE_Dissertation.pdf MEng Dissertation by Daniel Andrew Sen entitled "Stratification & Sampling of Electricity Consumer Data for Outage Cost Determination"]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Genetic load — In population genetics, genetic load or genetic burden is a measure of the cost of lost alleles due to selection (selectional load) or mutation (mutational load). It is a value in the range 0 < L < 1, where 0 represents no load. The concept …   Wikipedia

  • Stored-value card — A stored value card represents money on deposit with the issuer, and is similar to a debit card. One major difference between stored value cards and debit cards is that debit cards are usually issued in the name of individual account holders,… …   Wikipedia

  • VOLL — Value Of Lost Load (Governmental » Transportation) …   Abbreviations dictionary

  • National Electricity Market — The National Electricity Market (NEM) is the name of the Australian wholesale electricity market and the associated synchronous electricity transmission grid. The NEM began operation on 13 December 1998, and operations are currently based in five …   Wikipedia

  • Voll — may stand for:*Value of lost load *Reinhold VollVoll may refer to the following geographical locations:*Voll, Akershus in Bærum municipality, Akershus, Norway *Voll, Møre og Romsdal in Rauma municipality, Møre og Romsdal, Norway *Voll, Rennebu in …   Wikipedia

  • потери из-за недогрузки мощностей — (напр. на ТЭС, АЭС) [А.С.Гольдберг. Англо русский энергетический словарь. 2006 г.] Тематики энергетика в целом EN value of lost loadVLL …   Справочник технического переводчика

  • Maximum power transfer theorem — In electrical engineering, the maximum power transfer theorem states that, to obtain maximum external power from a source with a finite internal resistance, the resistance of the load must be equal to the resistance of the source as viewed from… …   Wikipedia

  • Control line — Brodak Control Line Aerobatic Strega in flight Control line (also called U Control ) is a simple and light way of controlling a flying model aircraft. The aircraft is connected to the operator by a pair of lines, attached to a handle, that work… …   Wikipedia

  • architecture — /ahr ki tek cheuhr/, n. 1. the profession of designing buildings, open areas, communities, and other artificial constructions and environments, usually with some regard to aesthetic effect. Architecture often includes design or selection of… …   Universalium

  • environment — environmental, adj. environmentally, adv. /en vuy reuhn meuhnt, vuy euhrn /, n. 1. the aggregate of surrounding things, conditions, or influences; surroundings; milieu. 2. Ecol. the air, water, minerals, organisms, and all other external factors… …   Universalium

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”