Konkan Railway

Konkan Railway
Konkan Railway
Overview
Type Regional rail
Status Operational
Locale Konkan, India
Termini Roha
Thokur
Stations 59
Operation
Opened 26 January 1998
Owner Government of India
Operator(s) Konkan Railway Corporation
Depot(s) Verna
Technical
Line length 738 km (458.57 mi)
Track length 738 km (458.57 mi)
No. of tracks 1
Track gauge 1676 mm (5 ft 6 in) (broad gauge)
Electrification None
Operating speed 160 km/h (99 mph)
An express train passing through Konkan Rail

The Konkan Railway (Railway Symbol:KR) is a railway line which runs along the Konkan coast of India. It was constructed and is operated by the Konkan Railway Corporation. It runs from Mangalore in Karnataka to Roha in Maharashtra through Goa, along the west coast of India and Western Ghats.

Contents

History

Background

Until the Konkan Railway started its operations, the two important port cities Mangalore and Mumbai were not directly connected by the railway network. Even though economic reasons provided a strong need to connect these two cities, the region through which the railway track passed was geographically very tough and would be an engineering challenge. Due to the uneven terrain of the region, railway lines were not laid for many years.

Although the brainchild of veteran parliamentarian from Ratnagiri, Barrister Nath Pai M.P., national leaders such as Madhu Dandavate and George Fernandes, who hailed from the Konkan played a major role in the conception of Konkan Railway. In 1966, a line was constructed between Diva in Mumbai and Apta in Raigad district. During the tenure of Madhu Dandavate, this was extended up to Roha in 1986, mainly to serve the industries located in the area. However, the missing link from Roha to Mangalore still remained. In October 1984, the Ministry of Railways decided to take a final location engineering-cum-traffic survey for the west coastal portion from Mangalore to Madgaon - a total distance of 325 km. In March 1985, the railways decided to extend the scope of their survey to include the omitted length of the west coast line extending from Madgaon to Roha. The Southern Railway was entrusted with this final location survey. They submitted the project report for this route to the Railway Ministry in 1988 and named it as the Konkan Railway after the coastline along which it runs.

The project gained impetus after George Fernandes became the Railway Minister in 1989. It was decided to constitute a separately incorporated railway company for the construction and operation of the line. Thus, on July 19, 1990, the Konkan Railway Corporation Limited (KRCL) was incorporated as a public limited company under the Companies Act, 1956, with its headquarters at CBD Belapur in Navi Mumbai and E. Sreedharan, a senior railway official, as its first Chairman and Managing Director. The company set itself a challenging target of five years to complete the work - something that had never been achieved in India before for a project of this magnitude. The foundation stone for the project was laid at Roha on September 15, 1990, and the Corporation had its task cut out.

Challenges

The 1,319 m (4,327 ft) long[1] Konkan Railway bridge across the Zuari river in Goa.

Drawing up their plans in an office, Mr. Sreedharan's team had yet to realise what kind of terrain they would have to battle, and though some surveys had been conducted, there was no data for the entire stretch in Maharashtra - a route which involved half the length of the line. Besides, the task was formidable. With a total number of over 2,000 bridges and 91 tunnels to be built through this mountainous terrain containing many rivers, the project was the biggest and perhaps most difficult railway undertaking during this century, at least in this part of the world.[2] A major challenge in the area was land acquisition. But though land related lawsuits are common in the Konkan, when KRCL began persuading people to give up property that had belonged to their families for generations, many gave it up voluntarily, convinced of the importance of the project. This enabled the entire process to be completed in just a year.[3]

There were challenges posed by the terrain and the elements. Flash floods, landslides and tunnel collapses affected work at many places on the project. The region was also thickly forested, and construction sites were often plagued by wild animals. Despite these problems, work on the project continued, and an effective system of decentralisation enabled better efficiency. The entire stretch of 740 kilometres (460 mi) was divided into seven sectors - Mahad, Ratnagiri north, Ratnagiri south, Kudal, Panaji, Karwar and Udupi - of approximately 100 km each, headed by a Chief Engineer.[4]

Contracts for the project were awarded to some of the biggest and most reputed construction firms in India, including Larsen and Toubro, Gammon India and AFCONS. To enable quicker construction, several innovative practices were adopted. Piers for major bridges were cast on the riverbanks itself and launched using cranes mounted on pontoons.[1] The technique of incremental launching of bridge spans was used for the first time in India.[5] Since it would take too long to complete the project using locally available tunnelling technology, nine hydraulic tunnelling machines were imported from Sweden[2] in order to bore through the hard rock of the Sahayadris. The biggest challenge, however, came from the nine tunnels that had to be bored through soft soil. No technology existed anywhere in the world for this purpose and the work had to be carried out through a painstakingly slow manual process. Excavation was almost impossible due to the clayey soil that was saturated with water owing to a high water table in the region. Several times tunnels collapsed immediately after they had been dug, necessitating work to be redone.[6] Nineteen lives and four years were lost while constructing the soft soil tunnels alone.[2][6] In all, seventy-four people perished during the construction of the line.

Controversy

Like most other major projects in India, the Konkan Railway was not without its share of controversies. The biggest one arose in the state of Goa, comprising 105 kilometres (65 mi) of the route, where serious concerns were raised about the environmental and economic impact of the line on the state. The opponents to the project stated that the proposed alignment, passing through the coastal regions of the state, would cause destruction of ecology, damage to historical sites and distrupt the lifestyles of people in the densely populated coastal region of the state. In 1991, they came together under and umbrella organisation called the Konkan Railway Re-Alignment Committee (KRRAC) and organised protests against the proposed alignment of the railway line.[7]

The main points raised by the KRRAC were that the existing alignment would cause flooding in coastal regions, destroy the fertile khazan lands, harm the monuments of Old Goa, cause irreparable damage to the marshes and mangrove swamps along the coastline and estuaries of the Mandovi and Zuari rivers, and result in the large-scale displacement of neighbourhoods along the coastal belt through which it passed. The KRRAC proposed an alternative alignment for the line, known as the hinterland alignment, to offset these problems. The hinterland alignment, passing through the relatively unpopulated hinterland of the state, was to be longer by about 25 kilometres (16 mi), but according to the KRRAC, would significantly minimise the damage caused to the environment.[8]

The hinterland alignment was rejected by the Konkan Railway Corporation on the grounds that it would involve substantial diversion of the line, deny rail access to the major towns of the state, and result in severe delays and escalation of costs of construction. By then, the KRRAC had grown into a political movement, backed by the powerful Church and certain political parties. In March 1992, it filed a public interest litigation in the Bombay High Court, seeking an injunction on the construction work and a diversion of the line through the hinterland alignment. In the plaint, it raised all the issues that had been brought up earlier. The High Court dismissed the plaint in April 1992, observing that

...the claim of the petitioners that the alignment would have devastating and irreversible impact upon the khazan lands is without any foundation, and even otherwise, the extent of damage is extremely negligible and a public project of such a magnitude which is undertaken for meeting the aspirations of the people on the west coast cannot be defeated on such considerations. It is not open to frustrate the project of public importance to safeguard the interest of few persons. It cannot be over looked that while examining the grievance about adverse impact upon a small area of 30 hectares of Khazan lands, the benefit which will be derived by large number of people by construction of rail line cannot be brushed aside. The Courts are bound to take into consideration the comparative hardship which the people in the region will suffer by stalling the project of great public utility. The cost of the project escalates from day to day and, as pointed out by the Corporation, the extent of the interest and east which will be suffered by the Corporation every day is to the tune of Rs. 45 lakhs. No development is possible without some adverse effect on the ecology and environment...[9]

Completion

Amid all the controversies and problems dogging the project, work continued to progress. In March 1993, the southernmost section of 47 kilometres (29 mi) between Thokur and Udupi in Karnataka was inaugurated, followed by the northernmost section of 47 kilometres (29 mi) between Roha and Veer in Maharashtra in June 1993. The first passenger train on Konkanrailway route was run between Mangalore and Udupi on 20 March 1993. The service was extended by 51 kilometres (32 mi) from Veer to Khed in March 1995, and by a further 265 kilometres (165 mi) from Khed to Sawantwadi Road in December 1996. Services on the southern end were extended by 32 kilometres (20 mi) from Udupi to Kundapura in January 1995, and by a further 275 kilometres (171 mi) till Pernem in Goa in August 1997.[10] However, through services between Mumbai and Mangalore continued to remain on hold due to a problematic tunnel at Pernem, which was facing repeated cave-ins and flooding.[11] The tunnel was finally completed in January 1998, six years after its construction had commenced.[12][13] Through services on the line commenced after a formal inauguration of the entire stretch of 740 kilometres (460 mi) from Roha to Thokur on January 26, 1998.[14] Trains carrying passengers started running along the full route between Mumbai and Mangalore from May 1998.[15] In October 1997, Mr. Sreedharan was asked to take up the responsibility of construction of the Delhi Metro Project.

Organisation

Karwar Railway station

KR does not have divisions like the other Indian Railways; however, it has two regions with headquarters at Ratnagiri in Maharashtra and Karwar in Karnataka. The Ratnagiri region extends over 380 kilometres (240 mi) from Roha to Sawantwadi in Maharashtra, while the Karwar region extends over 360 kilometres (220 mi) from Pernem in Goa to Thokur in Karnataka.

Route

Barkur Railway station

The route is a single-line track, and is not electrified. The total length of the line is about 738 kilometres (459 mi). Although it has been designed for high-speed traffic of 160 kilometres per hour (99 mph), the fastest train on the route, the Trivandrum Rajdhani Express, at present runs at a maximum speed of 130 kilometres per hour (81 mph). The route is open to both freight and passenger traffic. The line, which runs parallel to the Arabian Sea coastline, offers some of the most spectacular views of any Indian rail journey.The Konkan railway route intersects national highway NH-17 at many places.

There are fifty-six stations on the entire line. Although the route is currently a single line, KR and South Western Railway lines run parallel from Majorda to Madgaon in Goa, making that section a double line.

Operations

Passenger

The route became quite popular with passengers from the day it was opened, due to the connectivity it provided to regions hitherto inaccessible by rail, as well as the substantial savings in time for commuters between western and southern India. Several trains, which earlier took circuitous routes were diverted via the Konkan Railway, leading to a reduction in running time. The first of these was the Mumbai-Mangalore Netravati Express later extended to Trivandrum , which was diverted via the Konkan Railway from March 1, 1998, followed by the Rajdhani Express to Trivandrum from April 1, 1998.[16] The Matsyaganda Express running from Lok Manya Tilak Terminus, Mumbai to Mangalore was flagged off on May 1, 1998.[15] The Hazrat Nizamuddin - Mangalore Mangala Lakshwadeep Express was diverted on the route from August 1, 1998 and extended to Ernakulam Junction.[17] The Pune-Ernakulam Junction Express was introduced on February 25, 1999.[18] A new train called Marusagar Express runs between Jaipur and Ernakulam Junction (Now extended till Ajmer) via the Konkan Railway began it's service on October 12, 2001.[19] The Jan Shatabdi Express was flagged off between Mumbai and Madgaon (largest running Jan Shadabdi)on April 16, 2002, to commemorate 150 years of the existence of Indian Railways.[20][21] On February 1, 2008, a Garib Rath between Kochuveli satellite station of Thiruvananthapuram and LokmanyaTilak in Mumbai was flagged off.[22] Other trains like Trivandrum Central- Veraval, Gandhidham - Trivandrum- Nagercoil, Bikaner- Kochuveli, New Delhi- Kochuveli, Mangalore-Verna Passenger, Konkan Kanya Express and Mandovi Express from Goa to Mumbai, Kerala Sampark Kranti Express from Chandigarh to Kochuveli, Amritsar- Kochuveli Superfast Express, Happa-Tirunelveli Superfast Express and Dehradun-Kochuveli also pass through Konkan.

Now new train between Sawantwadi To Dadar is available named as Rajya Rani Express Express.

In the Railway Budget presentation on 25th Feb 2011, Railway Minister Kum.Mamta Banerjee has declared two new trains, Porbander- Kochuveli and Bhavnagar- Kochuveli via konkan and also declared the extension of Yeshvantpur- Mangalore Tri weekly Express to Karwar


At present, 86 passenger services operate each week in either direction.

A RORO train seen at Sawantwadi Road station.

Freight

Freight response to the Konkan Railway was lukewarm, prompting the worried corporation to consider cutting rates.[23] With an outstanding debt of Rs. 3,375 crore, KRCL was banking on freight traffic to bail it out.[24] In an effort to attract freight traffic, the corporation began creating awareness among local industries on the route.[25] In 1999, the corporation introduced the Roll-on/roll-off (RORO) service, a unique road-rail synergy system, on the section between Kolad in Maharashtra and Verna in Goa,[26] which was extended up to Surathkal in Karnataka in 2004.[27][28] The RORO service, the first of its kind in India, allowed trucks to be transported on flatcars. It was highly popular,[29] carrying about 1.6 lakh trucks and bringing in over Rs.120 crore worth of earnings to the corporation till 2009.[30]

Difficulties

The hostile terrain and difficult weather conditions of the Konkan region resulted in problems continuing to dog the line even after its inauguration. The first problems surfaced during the monsoon of 1998, when torrential rainfall caused landslides at many places, washed away tracks and disrupted services.[31] Despite the corporation's efforts at addressing the problems through engineering measures such as protective netting along cuttings to prevent boulders from rolling onto the tracks, the problems continued to recur each year.[32][33]

The first major accident on the line occurred on the night of June 22, 2003, when a landslide caused an express train travelling from Karwar to Mumbai to derail at the entrance to a tunnel. Fifty-one people died as a result of the accident, and several others were injured. As a result of the accident, the corporation came under heavy criticism for failing to adhere to adequate safety measures in the landslide-prone region.[34] An inquiry revealed the cause of the accident to be a failure of a cutting due to absence of monsoon patrolling.[35] The findings were disputed by the corporation, which insisted that the lack of monsoon patrolling did not lead to the accident which was entirely a result of the forces of nature.[35] Shortly after the accident, the corporation announced that it would enhance safety measures on the route.[36][37]

Barely a year later, these measures were found to be inadequate when a second major accident occurred on the line on June 16, 2004. The Matsyaganda Express bound to Mumbai from Mangalore derailed and fell off a bridge after colliding with boulders on the tracks, killing 14 people.[38][39] Again, the corporation insisted that the mishap was a result of nature's fury.[40][41] After the accident, questions were raised about the safety and credibility of the Konkan Railway,[42][43] prompting the resignation of its director Rajaram Bojji on August 31, 2004.[citation needed] An enquiry by the Commissioner of Railway Safety revealed the cause of the accident to be due to "falling of boulders and earth" on the tracks.[44] After the report, the corporation swung into action, implementing all its recommendations, including limiting the speed of trains during the monsoon to 75 km/h (47 mph) as opposed to the regular speed limit of 120 km/h (75 mph), as well as undertaking several geo-technical engineering works, including boulder netting, shotcreting, rock bolting, micropiling and vetiver plantations along the line to increase safety.[45][46]

See also

References

  1. ^ a b "Railway Bridges Across Zuari and Mandovi Rivers, Goa". Official webpage of AFCONS. http://www.afconsindia.com/Mandovi.pdf. Retrieved 2008-12-04. [dead link]
  2. ^ a b c Karlis Goppers. "Swedish Contribution to the Konkan Railway Construction Project in India". Official webpage of SIDA. http://www.sida.se/sida/jsp/sida.jsp?d=118&a=2339&language=en_US. Retrieved 2008-12-04. 
  3. ^ "LAND ACQUISITION". Official webpage of the Konkan Railway Corporation. http://www.konkanrailway.com/website/ehtm/intro3.pdf. Retrieved 2008-12-04. 
  4. ^ "Construction". Official webpage of the Konkan Railway Corporation. http://www.konkanrailway.com/website/ehtm/constr.pdf. Retrieved 2008-12-04. 
  5. ^ "Bridges:Panval Nadi Viaduct". Official webpage of SPA Consultants. http://www.spacpl.com/bridges/panval.htm. Retrieved 2008-12-04. 
  6. ^ a b "TRIBUNE : ITA Newsletter, dated June 2008". Official webpage of ITA-AITES. http://www.ita-aites.org/cms/fileadmin/filemounts/Tribunes_Pdf/T32-India_.pdf. Retrieved 2008-04-12. [dead link]
  7. ^ G. Raghuram. "Konkan Railway Corporation:Choice of Alignment in Goa". Vikalpa. http://www.iimahd.ernet.in/~graghu/Vikalpa/Kongan_Goa_1995_july_sep_53_70.pdf. Retrieved 2008-12-04. 
  8. ^ Indranil Banerjie. "ON THE WRONG TRACK". Online edition of Sunday magazine, March 29 - April 4, 1992. http://59.92.116.99/eldoc1/e21_/E21_B1003.pdf. Retrieved 2009-04-23. 
  9. ^ The Goa Foundation v. Konkan Railway Corporation, AIR 1992 Bom. 571.
  10. ^ "Paswan for quality coaches". Online edition of the Indian Express, dated 1997-08-26. http://www.indianexpress.com/res/web/pIe/ie/daily/19970826/23850403.html. Retrieved 2008-12-04. 
  11. ^ G.R. Singbal. "Jinxed Goan sector derails Konkan dream". Online edition of the Indian Express, dated 1997-07-31. http://www.indianexpress.com/res/web/pIe/ie/daily/19970731/21250153.html. Retrieved 2008-12-04. 
  12. ^ Ian J. Kerr. "Engines of Change". Google Books Preview. http://books.google.co.in/books?id=1F9QtYSSa0gC&printsec=frontcover#PPA62,M1. Retrieved 2008-12-04. 
  13. ^ "Konkan Railway ready to roll, at last". Online edition of the Indian Express, dated 1998-01-16. http://www.indianexpress.com/res/web/pIe/ie/daily/19980116/01650794.html. Retrieved 2008-12-04. 
  14. ^ Sandeep K.M.. "Vajpayee dedicates Konkan Rly to the nation". Online edition of the Indian Express, dated 1998-01-27. http://www.indianexpress.com/res/web/pIe/ie/daily/19980502/12250964.html. Retrieved 2008-12-04. 
  15. ^ a b "Naik flags off 'nameless' train". Online edition of the Indian Express, dated 1998-05-31. http://www.indianexpress.com/res/web/pIe/ie/daily/19980601/15250754.html. Retrieved 2008-12-04. 
  16. ^ "Mumbai Beat : Konkan Rly commissioned". Online edition of the Indian Express, dated 1998-01-26. http://www.indianexpress.com/ie/daily/19980126/02650194.html. Retrieved 2009-04-18. 
  17. ^ "Mumbai Notes:Mangla Express on Konkan route". Online edition of the Indian Express, dated 1998-07-21. http://www.indianexpress.com/res/web/pIe/ie/daily/19980721/20250694.html. Retrieved 2008-12-10. 
  18. ^ "At last, direct from Pune to God's own country". Online edition of the Indian Express, dated 1998-02-26. http://www.indianexpress.com/res/web/pIe/ie/daily/19990227/ige27131.html. Retrieved 2008-12-10. 
  19. ^ "Jaipur-Ernakulam train begins maiden journey". Online edition of the Times of India, dated 2001-10-08. 2001-10-08. http://timesofindia.indiatimes.com/articleshow/369844166.cms. Retrieved 2008-12-18. 
  20. ^ Tripti Nath. "First Jan Shatabdi flagged off". Online edition of the Tribune, dated 2002-04-17. http://www.tribuneindia.com/2002/20020417/main5.htm. Retrieved 2008-12-17. 
  21. ^ "JAN SHATABDI TRAINS - NEW DEFINITION OF PASSENGER COMFORTS IN THE 150TH YEAR". Press release, Press Information Bureau, dated 2002-04-12. http://pib.nic.in/archieve/lreleng/lyr2002/rapr2002/12042002/r120420021.html. Retrieved 2009-04-13. 
  22. ^ "Garib Rath brings Mumbai closer". Online edition of The Hindu, dated 2008-02-02 (Chennai, India). 2008-02-02. http://www.hindu.com/2008/02/02/stories/2008020260930300.htm. Retrieved 2009-04-13. 
  23. ^ Sandeep K.M.. "Konkan Rly asks Board to reduce "distance inflation"". Online edition of the Indian Express, dated 1998-09-06. http://www.indianexpress.com/res/web/pIe/ie/daily/19980906/24950744.html. Retrieved 2008-12-18. 
  24. ^ "KRC in dire straits over bridging debt gap". Online edition of the Indian Express, dated 1998-02-20. http://www.indianexpress.com/res/web/pIe/ie/daily/19980220/05150204.html. Retrieved 2008-12-18. 
  25. ^ Sandeep K.M.. "Industry slow in responding to KRC". Online edition of the Indian Express, dated 1999-01-30. http://www.indianexpress.com/res/web/pIe/ie/daily/19990130/03050825.html. Retrieved 2008-12-18. 
  26. ^ "ROAD-RAIL SYNERGY SYSTEM". Press release, Press Information Bureau, dated 2004-20-05. http://pib.nic.in/release/rel_print_page1.asp?relid=949. Retrieved 2008-12-22. 
  27. ^ "New Konkan Rly service begins". Online edition of the Business Standard, dated 2004-06-16. http://www.business-standard.com/india/storypage.php?autono=186663. Retrieved 2008-12-22. 
  28. ^ "RORO service again on Konkan Railway". Online edition of The Hindu Business Line, dated 2004-06-11. http://www.thehindubusinessline.com/2004/06/12/stories/2004061200931900.htm. Retrieved 2008-12-22. 
  29. ^ S. Vydhianathan. "Convergence on the Konkan Railway". Online edition of The Hindu, dated 2003-14-11. http://www.hinduonnet.com/thehindu/2003/11/14/stories/2003111402032000.htm. Retrieved 2008-12-22. 
  30. ^ "KONKAN RAILWAY EARNS OVER 120 Cr FROM RO-RO SERVICE". Official webpage of the Konkan Railway Corporation. http://www.konkanrailway.com/website/press_2005/RO-RO%20earning%20crosses%20120%20cr%20mark%20-%20040609.pdf. Retrieved 2009-06-08. 
  31. ^ "Konkan trains back to normal". Online edition of the Indian Express, dated 1998-07-14. http://www.indianexpress.com/res/web/pIe/ie/daily/19980714/19550644.html. Retrieved 2009-01-06. 
  32. ^ "Landslides and boulders block Konkan Rly's path". Online edition of the Indian Express, dated 1999-07-19. http://www.indianexpress.com/res/web/pIe/ie/daily/19990719/ige19045.html. Retrieved 2009-01-06. 
  33. ^ "Konkan Railway suspends operations due to landslips". Online edition of the Pioneer, dated 2000-07-13. http://www.indiaenvironmentportal.org.in/node/93724. Retrieved 2009-01-06. 
  34. ^ "Konkan Railway Mishap : No Anti-Collision Device fitted". Goanet. http://lists.goanet.org/pipermail/goanet-goanet.org/2003-June/088927.html. Retrieved 2008-01-06. 
  35. ^ a b "Report of Commissioner of Railway Safety". Official webpage of the Commissioner of Railway Safety. http://civilaviation.nic.in/ccrs/accidents/2003-2004/DETAILS%20OF%20%20ACCIDENTS/ACCIDENT(ix)%20OF%202003-2004.htm. Retrieved 2009-06-01. 
  36. ^ "Konkan Railway to run inspection locomotives". Online edition of The Hindu, dated 1003-07-25}. http://www.hinduonnet.com/2003/06/26/stories/2003062604551200.htm. Retrieved 2009-01-06. 
  37. ^ "Geological Challenges & New Solutions by Konkan Rly". Official webpage of Konkan Railway Corporation. http://www.konkanrailway.com/website/bulliten/safety_enhancing_%20measures_taken.htm. Retrieved 2009-01-06. 
  38. ^ "Rail crash due to 'natural cause'". BBC News, dated 2004-06-17. 2004-06-17. http://news.bbc.co.uk/1/hi/world/south_asia/3815573.stm. Retrieved 2009-01-06. 
  39. ^ Chandrima S. Bhattacharya. "Showpiece to death train: by boulders". Online edition of the Tribune, dated 2004-06-17. http://www.telegraphindia.com/1040617/asp/nation/story_3381886.asp. Retrieved 2009-01-06. 
  40. ^ "Nature's fury caused derailment: Konkan Railway". Online edition of The Hindu, dated 2004-06-17 (Chennai, India). 2004-06-17. http://www.hindu.com/2004/06/17/stories/2004061706301100.htm. Retrieved 2009-01-06. 
  41. ^ Stanly Pinto (2004-06-16). "Mother Nature plays the spoiltsport". Online edition of the Times of India, dated 2004-06-16. http://www1.timesofindia.indiatimes.com/articleshow/742563.cms. Retrieved 2009-01-06. 
  42. ^ Bisheshwar Mishra (2004-06-17). "Technical fault or just boulders? Probe on". Online edition of the Times of India, dated 2004-06-17. http://timesofindia.indiatimes.com/articleshow/743051.cms. Retrieved 2009-01-06. 
  43. ^ "How Safe Is Railways’ Safety Measures?". Online edition of the Financial Express, dated 2004-06-17. http://www.financialexpress.com/news/how-safe-is-railways-safety-measures/108342/. Retrieved 2009-01-06. 
  44. ^ "Report of Commissioner of Railway Safety". Official webpage of the Commissioner of Railway Safety. http://civilaviation.nic.in/ccrs/accidents/2004-2005/DETAILS%202004-2005/ACCIDENT(iv)%20OF%202004-2005.htm. Retrieved 2009-01-06. 
  45. ^ "Konkan Railway gears up for the monsoon". Official webpage of the Konkan Railway Corporation. http://www.konkanrailway.com/website/press_2005/Monsoon%20safety%20work-2008.pdf. Retrieved 2009-04-13. 
  46. ^ "Geotech safety works". Official webpage of the Konkan Railway Corporation. http://www.konkanrailway.com/website/bulliten/write-up-geosafety-08-01-08.pdf. Retrieved 2009-04-13. 

Pages from the Konkan Railway website:

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • Konkan Railway Corporation — (KRC) is a subsidiary of the Indian Railways (IR). It operates the Konkan Railways, a subsidiary zone of the Indian Railways. Its headquarters is at Belapur in New Bombay. KRC has been making losses since it opened in the 1990s prompting many to… …   Wikipedia

  • Konkan Railway Corporation Employees Union — Konkan Railway Corporation Employees Union, a trade union of employees of the Konkan Railway, India. KRCEU is affiliated to the Hind Mazdoor Kisan Panchayat.In the union elections in 2005 KRCEU got 32% of the votes, and lost its hold of the union …   Wikipedia

  • Konkan Kanya Express — is an Indian Railways train running between Mumbai and Madgaon on the Konkan Railway route. The train covers the 765 km journey in about 13.5 hours. Konkan Kanya literally means Konkan s virgin, [ [http://www.experiencefestival.com/kanya Kanya ]… …   Wikipedia

  • Konkan — For the village in Burkina Faso, see Konkan, Burkina Faso. A typical view of the Konkan, consisting of white sand beaches and palm trees (mostly coconut and betel nut). The Konkan (Marathi/Konkani: कोंकण;) also called the Konkan Coast or Karavali …   Wikipedia

  • Kashmir Railway — The Kashmir Railway is a railway line being built in India to connect the state of Jammu and Kashmir with the rest of the country. The Project officially coded USBRL (Udhampur Srinagar Baramulla Railway Link) starts from the city of Udhampur,… …   Wikipedia

  • Central Railway Zone (India) — Central Railway 8 Central Railway CR s headquarters Chhatrapati Shivaji Terminus …   Wikipedia

  • Northeast Frontier Railway Zone (India) — Northeast Frontier Railway 3 Northeast Frontier Railway Locale Assam, Bihar and West Bengal Dates of operation 1958– Predecessor …   Wikipedia

  • Northern Railway Zone (India) — This article is about the northernmost zone of the Indian Railways. For other uses, see Northern Railway (disambiguation). Northern Railway 1 Northern Railway Dates of operation 1952– Track gauge …   Wikipedia

  • North Central Railway Zone (India) — North Central Railway 13 North Central Railway Dates of operation 2009– Track gauge Mixed Headquarters Allahabad …   Wikipedia

  • North Eastern Railway Zone (India) — North Eastern Railway System map 2 North Eastern Railway Dates of operation 1952– Track gauge Mixed Headquarters Gorakhpur Website North Eastern Rai …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”