The LGV Sud-Est is a French high-speed passenger rail line, which links Paris and Lyon. The inauguration of the first section between Saint-Florentin (Yonne) and Sathonay (Rhône) on 22 September, 1981 marked the beginning of the re-invigoration of French passenger rail service.

This line, subsequently extended southwards by the LGV Rhône-Alpes and LGV Méditerranée and northwards by the LGV Interconnexion Est, has led to the speeding up of journey times:
* between Paris and the southeast quarter of France (and by extension towards Switzerland and Italy)
* between the southeast and the north and west of France (and by extension towards Britain and Belgium)

Route

The line crosses six "départements", from north to south:

* Seine-et-Marne
* Yonne
* Côte-d'Or
* Saône-et-Loire
* Ain
* Rhône

The TGV system's compatibility with the regular rail network avoided the need for new infrastructure construction in the dense urban areas of Paris and Lyon.

The distance from Paris (Gare de Lyon) to Lyon (Part-Dieu) is 425 km. The LGV route is 409 km long; by avoiding built-up areas between Paris and Lyon (particularly Dijon) this enables a route 87 km shorter than the regular line (512 km). There are no tunnels.

The line includes various connectors to the regular rail network:
* at Pasilly-Aisy towards Dijon, and further through the Jura mountains to Vallorbe/Lausanne or Neuchâtel/Zürich
* at Mâcon-Pont-de-Veyle towards Bourg-en-Bresse and Savoie
* at Saint-Florentin
* at Le Creusot TGV station
* at Mâcon-Loché stationThese last three are used by service trains or in order to divert passenger trains if needed.

The line runs next to the A5 autoroute for 60 km and the N79 road for 15 km. For its full length, a 5 m wide area has been reserved for a telecommunication artery.

Line specifics

The line has a surface area of 16 square kilometres (in comparison Charles de Gaulle International Airport occupies 32 square kilometres), with an average width of 40 m. Platforms are 13 m wide, with a space between track centres of 4.2 m. The line was designed for a nominal speed of 300 km/h, with a minimum radius curve of 4,000 m (although 7 curves were made to a smaller radius, but no less than 3,200 m.)

In total, the line comprises 847 km of track. This is formed by UIC 60 (60.3 kg/m) rails placed in lengths of 288 m, welded in place (with certain segmented sections.) The concrete sleepers of 2.41 m are formed of two blocks of concrete tied together by a metal strut. There are 1660 sleepers per kilometer.

Traction power is supplied by eight EDF substations at 25 kV AC, 50 Hz. The catenary is fed by a "feeder" cable in phase opposition, which is equivalent to a 50 kV supply and reinforces the available power, one trainset being able to draw up to 14 MW.

Signalling draws on high-frequency track circuits, signals being transmitted directly to the driver's console. There are lineside marker boards indicating the limits of each block section, but no signals as such.

tations

The LGV Sud-Est serves the following stations:
* Le Creusot
* Mâcon-Loché
* Lyon Part-Dieu

Le-Creusot and Mâcon-Loché are basic-looking stations situated away from built-up areas. They have two side platforms and four tracks, the two central tracks being reserved for through trains, the side tracks serving for stopping trains.

History

* 10 July 1967: SNCF research management launches project C 03 on high speed, titled "Rail Transport Possibilities through New Infrastructure"
* 26 March 1971: approval of new line project by inter-ministerial committee
* 23 March 1976: declaration of public utility, the decree being signed by Jacques Chirac, prime minister
* 7 December 1976: works commence at Écuisses (Saône-et-Loire)
* 14 June 1979: first rails laid near Montchanin (Saône-et-Loire)
* 20 November 1980: track laying ends (Cluny)
* 22 September 1981: inauguration of first section (Saint-Florentin-Sathonay) to Montchanin by President of the Republic, François Mitterrand
* 26 February 1981: trainset no. 16 (TGV Sud-Est) breaks the world record for rail speed at 380 km/h between Courcelles-Frémois (Côte-d'Or) and Dyé (Yonne) in a gradually descending portion of the line
* 27 September 1981: commercial service begins
* 25 September 1983: service begins on northern section (Combs-la-Ville - Saint-Florentin)
* 31 August 1992: derailment at 270 km/h of TGV in Macon-Loché station; several waiting passengers on the platform are slightly injured by flying ballast
* 13 December 1992: service begins on northern section of LGV Rhône-Alpes (from Montanay to Saint-Quentin-Fallavier)
* 26 May 1994: service begins on LGV Interconnexion Est (connection with LGV Nord)
* March 1996: beginning of line renovation works (replacement of ballast and points, works designed to last until 2006)
* 2 June 1996: service begins at the junction with Villeneuve-Saint-Georges by the Coubert triangle

ee also

* High-speed rail
* TGV

External links

* [http://lgv2030.free.fr/ligne1.htm#SudEst High-speed rail lines site (in French)]


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • LGV Sud-Est — (LN1) Ligne de (Paris) Combs la Ville à Sathonay (Lyon) Carte de la ligne …   Wikipédia en Français

  • Lgv sud-est — (LN1) Ligne de (Paris) Villeneuve Saint Georges à Sathonay (Lyon) Carte de la ligne …   Wikipédia en Français

  • LGV Sud-Est — Kursbuchstrecke (SNCF): 500 und 509 Streckennummer (RFF): 752 000 Streckenlänge: 428,97 km Spurweite …   Deutsch Wikipedia

  • LGV Sud-Est — Saltar a navegación, búsqueda LGV Sud Est Leyenda …   Wikipedia Español

  • LGV Interconnexion Est — Carte de la ligne …   Wikipédia en Français

  • LGV Interconnexion Est — Saltar a navegación, búsqueda LGV Interconnexion Est Leyenda …   Wikipedia Español

  • LGV Interconnexion Est — Streckenlänge: 57 km Spurweite: 1435 mm (Normalspur) Stromsystem: 25 kV 50 Hz  …   Deutsch Wikipedia

  • LGV Interconnexion Est — SNCF Name=PAGENAME ColourName=#dddddd The LGV Interconnexion Est is a French high speed rail line that connects the LGV Nord and LGV Sud Est through the Île de France. Opened in 1994, it consists of three branches, which begin at Coubert:* west… …   Wikipedia

  • LGV Sud Europe Atlantique — Ligne de Tours à Bordeaux Carte de la ligne Pays   …   Wikipédia en Français

  • LGV Sud-Europe Atlantique — Ligne de Tours à Bordeaux Carte de la ligne Pays   …   Wikipédia en Français

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”