Freight Route Utilisation Strategy

Freight Route Utilisation Strategy

The Freight Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail in March 2007.[1][2][3] It is one of only two (the future Network RUS is the other) which have the perspective of the network as whole. It was included in a map published by the Office of Rail Regulation (ORR) as established in May 2007 [4]. As with other RUSs, the Freight RUS took into account a number of responses[5][6][7] to a Draft for Consultation[8][9], including the ORR [10].

To quote the Foreword: "Rail freight...has grown rapidly in the last 10 years...this strategy forecasts further growth of up to 30 percent - the equivalent of an extra 240 freight trains per day – over the next ten years [to 2014/5 from 2004/5]. For this additional demand to be met by road freight...would lead to around an extra 1.5 million lorry journeys on the roads each year."

The study recommends a number of approaches and enhancements to the network; the chief recommendation is probably the enhancement of the loading gauge from Southampton and the East Anglia coast ports to West Coast Main Line (WCML).

Most growth is expected in the carriage of deep-sea containers and coal for the electricity-generating industry, mainly in the Aire and Trent valley. Much coal is imported via the east coast ports.

Like other strategies in this series, recommendations are divided into short-term (Control Period 3, CP3, to March 2009), medium-term (CP4, to March 2014), and long-term (CP5, thereafter).

A key issue is the loading gauge of routes and potential routes for freight in particular for the carriage of sea-going (9' 6" in height, 2500 mm in width) containers. Such loads are accommodated on routes cleared to W10 on standard wagons. W12 is only slightly wider than W10, and the Freight RUS recommends that where structures are renewed the starting assumption should be that they are cleared to W12.

Some issues are addressed in other (prior or subsequent) RUSs.

Unlike passenger services, which over the course of a day tended to have comparable flows in both directions, freight movements have more unidirectional aspects and issues. Even though rolling stock does need in most cases to return to the original departure point this may be via a different route; moreover, problems arising from fully loaded trains and/or steep gradients may disappear from returning empty trains.

Contents

Recommendations by route

West Coast Main Line (WCML)

Short term Freight operators' requirements to be included in the December 2008 recasting of the WCML timetable; some services to be rerouted away from Stafford, via Macclesfield; new loop at Hartford, Cheshire.

Medium term Electric haulage of some new freight traffic between Crewe/Warrington and Carlisle/Glasgow; diversion of some services via the Settle and Carlisle route; W10 and extra capacity between Peterborough and Nuneaton to provide 5 additional paths from Felixstowe to Nuneaton avoiding the southern part of WCML.

Long term Infrastructure to allow the lengthening of container trains serving the Haven ports (see below) from 24 to 30 waggons; major enhancements in the Stafford area and to the Felixstowe to Nuneaton route (the latter to allow more capacity, to avoid the southern WCML).

Anglo-Scottish coal route

This is from the Ayrshire coast and open-cast mines to the Aire and Trent valley power stations. Recommendations are mainly short term, involving redoubling of the Annan-Gretna route and speeding up the junction with the WCML, and signalling enhancements to the Settle and Carlisle route.

Haven ports to the WCML

The Haven ports are Felistowe, Ipswich and Harwich.

Short term Capacity upgrades paid for by Hutchison Ports UK for planning permission for port expansion, including W10 clearance between Ipswich and Doncaster via Peterbrough; growth in demand to be accommodated on the route via the North London Line (NLL).

Medium term W10 clearance west of the East Coast Main Line (ECML) to Leicester and Nuneaton, together with other capacity enhancements to avoid the southern part of WCML; also W10 clearance of the Barking to Gospel Oak line to allow trains from North Thameside to avoid the NLL, leaving more paths for Haven ports trains.

Long term Infrastructure to allow the lengthening of container trains from 24 to 30 waggons.

East Coast ports to the Aire and Trent Valley power stations

For this purpose the East Coast ports are Blyth, Tyneside, Teesport (Redcar), Hull and Immingham.

Short term Timetable changes and train lengthening to/from Immingham (already implemented by the time of the RUS publication); Brigg line and Wrawby junction enhancements; Hull Docks branch partial doubling; restoring of Boldon East curve to provide access to Durham Coast line avoiding congested parts of ECML.

Medium term A loop on the Killingholme branch line near Immingham; a chord from the Brigg line to Cottam power station, providing direct access from Immingham; signalling enhancement at Selby and a loop at nearby Barlby, allowing lengthening of trains to/from Hull.

Long term Protection of the route of the mothballed Leamside line near Tyneside.

Southampton to WCML

Short term Signalling enhancements on the route from Leamington to the WCML via Birmingham (this route provides an alternative to the most direct route via Coventry and Nuneaton).

Medium term W10 clearance of

  • the core route via Eastleigh, Reading West Jct, Leamington and Nuneaton
  • the alternative Leamington-WCML route via Birmingham (Sutton Park line)
  • possibly southern diversionary routes via Melksham and/or Laverstock/Andover.

Long term Possible grade separation at Reading West Jct.

Subsequent developments

Projects at various stages

Completed: Annan-Gretna redoubling [11]; Brigg line and Wrawby junction enhancements [12]; partial doubling of the Hull Docks branch [13].

Funded and authorised to completion [14]: W10 clearance through Ipswich and Peterborough to Doncaster and Yorkshire terminals (Doncaster Europort, Selby Potter Group, Wakefield Europort and Leeds Stourton) [15]; Settle and Carlisle enhancements, including extra intermediate block signalling; Gospel Oak to Barking W9 and W10 clearance; Hampstead Tunnel W10 clearance [16].

Authorised to GRIP stage 3, 4 or 5, for implementation in CP4 [17]: Peterborough to Nuneaton gauge improvements; Southampton - West Coast Main Line gauge enhancements. Enhancements to North London Line (east of Camden Road), including signalling enhancements, four-tracking and additional freight loops, are scheduled for implementation also in CP4, probably funded by Tfl.

Boldon East curve being pursued for CP4.

DfT's 2007 HLOS

The British Government's Department for Transport (DfT) published in July 2007 a White Paper 'Delivering a Sustainable Railway' [18], intended to provide strategic direction for the rail industry. This contained the High Level Output Specification and Statement (HLOS) of funds available, covering the period 1 April 2009 to 31 March 2014, in accordance with a statutory duty set by the Railways Act 2005 to state quinquennially the quantum of public expenditure to be devoted to rail. It specifies what the Government requires the railway to deliver, especially in relation to safety, reliability and capacity.

The White Paper also takes a 30-year view on future strategy within the national railway network, emphasising the partnership between the Government and the rail industry, and identifying three long-term themes:

  • increasing the capacity of the network
  • providing a quality and reliable service for passengers
  • enhancing rail's environmental potential.

It also endorses the Freight RUS, and in Chapter 9, which deals explicitly with freight, moots the development of a Strategic Freight Network going beyond the RUS, but without specific detail.

References


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • Route Utilisation Strategy — Not to be confused with Network Route Utilisation Strategy. Network Rail (NR) has an obligation, transferred from the abolished Strategic Rail Authority, to periodically produce Route Utilisation Strategy (RUS) documents.[1] The current programme …   Wikipedia

  • Scotland Route Utilisation Strategy — The Scotland Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail in March 2007,[1] the third RUS to be published. The railways in Scotland are divided into three strategic routes, namely Route 24 (East of… …   Wikipedia

  • Network Route Utilisation Strategy — Not to be confused with Route Utilisation Strategy. The Network Route Utilisation Strategy (Network RUS) is a Route Utilisation Strategy (RUS) produced by Network Rail (NR). The Network RUS is one of only two (the Freight RUS is the other) which… …   Wikipedia

  • Merseyside Route Utilisation Strategy — The Merseyside Route Utilisation Strategy is a Route Utilisation Strategy published by Network Rail in March 2009.[1] It was the eleventh RUS to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the… …   Wikipedia

  • East Coast Main Line Route Utilisation Strategy — The East Coast Main Line Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail in February 2008 [1][2][3] It was the seventh RUS to be produced. By default, RUSs are established by the Office of Rail… …   Wikipedia

  • Greater Anglia Route Utilisation Strategy — The Greater Anglia Route Utilisation Strategy is a Route Utilisation Strategy published by Network Rail in December 2007.[1] It was the sixth RUS to be produced. The area covered includes the whole of Route 5 West Anglia (WA) and Route 7 Great… …   Wikipedia

  • South London Route Utilisation Strategy — Network Rail s (NR) South London Route Utilisation Strategy (SLRUS), published in March 2008[1][2][3] (SLRUS) was the eighth Route Utilisation Strategy to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless …   Wikipedia

  • North West Route Utilisation Strategy — The North West Route Utilisation Strategy (NWRUS) is a Route Utilisation Strategy, published by Network Rail in May 2007.[1][2] It was the fifth RUS to be produced. It was included in a map published by the Office of Rail Regulation as… …   Wikipedia

  • South West Main Line Route Utilisation Strategy — The South West Main Line Route Utilisation Strategy (SWML RUS) was the first Route Utilisation Strategy (RUS) to be produced under the new Network Rail regime. As such it did not completely adhere to the format that has subsequently become… …   Wikipedia

  • Yorkshire and Humber Route Utilisation Strategy — The Yorkshire and Humber Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail in July 2009 [1]; it was the twelfth RUS to be completed, not counting the partially completed Network RUS. By default, RUSs are… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”