NTPC Ramagundam

NTPC Ramagundam
NTPC Ltd., Ramagundam
NTPC Ramagundam is located in India
{{{alt}}}
Location of NTPC Ltd., Ramagundam
Country India
Location Ramagundam, Andhra Pradesh
Coordinates 18°45′18″N 79°27′22″E / 18.755°N 79.45611°E / 18.755; 79.45611Coordinates: 18°45′18″N 79°27′22″E / 18.755°N 79.45611°E / 18.755; 79.45611
Status In operation (94.81 PLF)
Commission date 1983
Owner(s) NTPC Ltd.
Power station information
Primary fuel Coal
Generation units 7
Power generation information
Installed capacity 2600 MW
Annual generation 21,594.653 MU

NTPC Ramagundam, a part of National Thermal Power Corporation, is a 2600 MW Power station situated at Ramagundam in the state of Andhra Pradesh, India. It is the current largest power station in South India. It is the first ISO 14001 certified "Super Thermal Power Station" in India.[1]

Contents

The TG Hall

Turbo-Generator Hall, UNIT#7, NTPC Ltd., Ramagundam

The TG Hall or the Turbo-Generator hall or the Turbine-Generator Hall is the hall or space where the turbine-generator sets are present.

NTPC Ltd., Ramagundam has two TG Halls one for STAGE - I and the other common for STAGE-II and STAGE-III. These TG halls are equipped with heavy overhead cranes that assist in transportation of material to, from and within the TG hall. These cranes find their use greatly during overhauls.

Unit-wise power generation

The whole plant is divided into 3 stages, each stage being planned at one time.

STAGE 1 (3 * 200MW)

This stage consists of three units(Unit-1, Unit-2, Unit-3) each with a generation capacity of 200MW. The turbines for these three units were manufactured by The Ansaldo Energia Ltd. The construction began in the late 1970s and these units have performed well over a long period setting many records regarding maintenance and generation over the other two stages.

STAGE 2 (3 * 500MW)

This stage again consists of three units (Unit-4,Unit-5,Unit-6) each with a generation capacity of 500MW. The turbines for these three units were manufactured by Bharat Heavy Electricals Limited(BHEL). These Units have shown a relatively lower performance. Especially Unit-6 has imposed many problems on the maintenance departments.

Outside view of STAGE-III (Unit#7)

STAGE 3 (1 * 500MW)

This stage comprises only one unit (Unit - 7). This is a first of its kind in South India being a computer operated unit. A wide disparity may be seen between the control rooms of the other two stages and this computerized unit. To this day, many Power plant engineers train in this unit to upgrade themselves to this new mode of operation.This unit also has the tallest chimney in Asia.

OVERHAULS

Once in two years, these units are stopped and overhauled, one unit at a time. The overhauls are usually taken up during the months June to September as the monsoons activate hydel power generation which substitute the power generation lost due to the overhaul of the unit. The same practice is followed all through the country. The overhauls usually take 15 to 20 days per unit provided there is no major repair involved. Major repairs include turbine casing,turbine rotor damage and other damages that require transporting the equipment to another location(usually the manifacturer). The overhauls are the dissipators of the annual PLF of any power plant.

Generation Distribution

States

As NTPC Ltd. is a Public Sector Undertaking(PSU), the generation is almost uniformly distributed to 4-5 states all of them sharing about 20-25 percent of the Generation. The States include:

The Switchyard

The switchyard is the place where the station last takes care of the power it produces. The switchyard links the power generated to the southern Power grid. The major transmission points are:

Inputs

Water

The power station gets it water periodically released from the SRSP- Sriram Sagar project. This water is stored in the balance reservoir. The water level in the balance reservoir is monitored day-to-day.

Coal

NTPC Ramagundam is a Thermal Power Station and hence uses coal. This coal is available at a large scale from the Singareni Coal mining company nearby and is transported using the MGR(Merry-go-round) system wherein, a train comes on one railroute, delivers coal and returns on another route. The wagons arriving by this route are taken for coal collection wherein a mechanism provided underneath the wagons opens on application of air pressure and drops the coal it is carrying. A separate department(MGR Dept.) handles this process.

Coal also arrives by the Indian Railways. The wagons are routed via Ramagundam railway station to the separate plant line and these coaches arrive at the wagon tippler. The wagons arriving in this manner must be tilted at the wagon tippler to obtain the coal as they do not have the drop mechanism underneath.

Other petroleum products required

The station also requires various oils for the following purposes:

  • Turbine oil (SP-46)for turbine Lubrication
  • HFO, Heavy fuel oil for boiler start-up
  • Diesel for DG sets (Power backup)
  • Other oils for various hydraulic controls and circuits

These are periodically purchased as per requirement from the Indian oil corporation IOCL establishment nearby.

Departments

The plant classifies its departments as O&M and Non-O&M.

Departments under O&M

Operation

The operation department has the maximum number of employees. It takes care of operation of the various equipments and controls in the plant.The operation department takes care of the unit control rooms(UCBs).A power plant operates 24 X 7 so, the operation department works in shifts to take care of the units at all times.

Electrical Maintenance

This is the largest department under the Maintenance section. This department takes care of all the electrical aspects of the plant.It takes care of the following sections

Switchyard of NTPC Ltd., Ramagundam
  • Switchyard
  • Generator
  • Generator Transformer
  • Conveyor motors and other motors
  • All power transmissions

Civil Maintenance

Civil Maintenance takes care of all the civil activities in the plant such as non-mechanical constructions, maintenance of locations, scrap removal and ensuring a proper working condition of minor equipments.

MGR(Merry-go-Round) Department

This dept. takes care of the coal transport to the plant.

CHP (Coal Handling Plant)

This dept. takes care of all coal handling processes.

  • Coal collection
  • Coal crushing
  • consequent milling

Mechanical Maintenance

This dept. has the following sections
Boiler Maintenance

  • Boiler feeders
  • Primary and secondary air pumps
  • Boiler feed pumps
  • Boiler core parts

Turbine Maintenance

  • Turbine core parts
  • Turbine governing system

Control & Instrumentation

This department deals with the maintenance of various control devices and instruments. its considered to be a part of the maintenance section. It has got the following sections. 1.Boiler C&I 2.ACS&DAS C&I 3.Turbine C&I

Departments under non-O&M

  • HR
  • Finance
  • Materials and contracts
  • IT...etc...

Staff

The plant is headed by the General manager(GM) to whom the AGM's report.The O&M group being reported by the Additional General Manager(O&M) again to whom the AGMs of concerned departments report.

The AGM's are again reported to by the Heads of various departments(DGM level) and so on following the order below

  • GM
  • AGM
  • DGM
  • Senior Superintendent
  • Manager
  • Deputy Manager
  • Senior Engineer
  • Engineer
  • ET (Executive trainee)
  • Assistant Engineer

Township

NTPC, Ramagundam has a very beautiful and a serene township.The TTS is the temporary township constructed during the early stages of the plant .Itis now resided by the secondary employees of the organisation( Contractors,Allied organisation employees,service organisations to the township like Dooradarshan...etc...)

The PTS is the permanent township where most off the employees reside with their families.Itt is known for its serenity,cleanliness,Greenery and its parks.

Schools

The township has three schools. The k.v,Saint Claire High school and the Sachdeva school of excellence(formerly Chinmaya Vidyalaya).

Shopping

The township has a main shopping centre and Four small shopping centres where the residents may shop for groceries and other regular needs.

Facilities

The township is well facilitated with banking( The State Bank of Hyderabad with an on-site ATM), postal services,telephone and internet services(BSNL),Adequate water supply, 24*7 electricity right from the plant,Civil services and its own security.

Guest Houses and Restaurants

There are two Guest houses. Jyothi bhavan for executives and Godavari Bhavan(Field Hostel) for other employees, students and trainees. These are maintained by the Indian Coffee House employees and are equipped with dining facilities thus forming as restaurants for the township residents.

Parks

The township has beautiful parks namely the Ambedkar park, the Chacha Nehru park, the priyadarshini park and other small parks. and in it theaters are also there.

References

  1. ^ [1]

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Ramagundam — Infobox Indian Jurisdiction native name = Ramagundam | type = city | latd = 18.8000 | longd = 79.4500 state name = Andhra Pradesh district = Karimnagar leader title = leader name = altitude = 179 population as of = 2001 population total =… …   Wikipedia

  • NTPC — National Thermal Power Corporation (NTPC) ist ein Unternehmen aus Indien mit Firmensitz in Delhi. Das Unternehmen ist im Aktienindex SENSEX 30 gelistet. NTPC ist ein staatliches Unternehmen, dessen Hauptanteile im Besitz der indischen Regierung… …   Deutsch Wikipedia

  • Godavarikhani — is a town in Karimnagar district of Andhra Pradesh in the southern part of India. It is basically an industrial area with a high population. It is surrounded by other mining areas like Srirampur, Ramakrishnapur etc. Its located on the banks of… …   Wikipedia

  • Karimnagar — Infobox Indian Jurisdiction native name = Karimnagar type = city latd=18 |latm=26 |lats=13|longd=79 |longm=07 |longs=27 locator position = right state name = Andhra Pradesh district = Karimnagar leader title = leader name = altitude = 265… …   Wikipedia

  • Dr Narla Tata Rao Thermal Power Station — Country India Location Vijayawada, Krishna, Andhra Pradesh Status active Commission date 1979 Operat …   Wikipedia

  • National Thermal Power Corporation — NTPC Limited Type State owned enterprise Public Traded as BSE: 532555 …   Wikipedia

  • National Thermal Power — Corporation (NTPC) ist ein Unternehmen aus Indien mit Firmensitz in Delhi. Das Unternehmen ist im Aktienindex BSE Sensex gelistet. NTPC ist ein staatliches Unternehmen, dessen Hauptanteile im Besitz der indischen Regierung sind. Gegenwärtig… …   Deutsch Wikipedia

  • List of cities and towns in India — This is a list of cities in India whose population is above 20,000. According to Census 2001 data cities and towns are broadly classified as: Class I – Population greater than 100,000 Class II – Population between 80,000 – 99,999 Class III –… …   Wikipedia

  • Visakhapatnam — Visag redirects here. For the Romanian village, see Victor Vlad Delamarina, Timiş. For the Romanian village of Vişagu, called Viság in Hungarian, see Săcuieu. Visakhapatnam (విశాఖపట్నం) VIZAG   city   …   Wikipedia

  • Maner River — The Maner river is a tributary to the Godavari River in India. The Lower Maner Dam built across this river provides drinking water to Karimnagar, Andhra Pradesh and also to the NTPC power plant at Ramagundam. Coordinates: 18°41′N 79°49′E …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”