Deleni Wind Farm

Deleni Wind Farm
Deleni Wind Farm
Country Romania
Location Deleni
Status Under construction
Commission date 2014 (expected)
Developer(s) Midmar Callatis
Enol Group
Turbine information
Turbines 250 x 2 MW
Power generation information
Maximum capacity 500 MW
As of 19 December 2010

The Deleni Wind Farm is an under construction wind power project in Constanţa County, Romania. It will consist of an individual wind farm with 250 individual wind turbines with a nominal output of around 2 MW which will deliver up to 500 MW of power, enough to power over 327,000 homes, with a capital investment required of approximately €1.5 billion.[1]

References



Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Mărişelu Wind Farm — Location Mărişelu, Cluj County Status Approved Commission date 2011 Owner(s) City council …   Wikipedia

  • Dobrogea Wind Farm — For CEZ developed project, see Fântânele Cogealac Wind Farm. EDP Dobrogea Wind Farm Location Dobrogea region Status Under construction Commission date 2010 Owner(s) EDP Renováveis …   Wikipedia

  • Orşova Wind Farm — Location Orşova, Mehedinţi County Status Under construction Commission date 2009 Owner(s) Toplet Energy …   Wikipedia

  • Mereni Wind Farm — Country Romania Location Mereni Status Under construction Commission date 2014 (expected) Developer(s) Westwind …   Wikipedia

  • Corbiţa Wind Farm — Location Corbiţa, Vrancea County Status Approved Commission date 2010 Owner(s) Energycum …   Wikipedia

  • List of wind farms in Romania — The Tihuţa Pass is situated at an altitude of 1,200 m (3,900 ft). As of 2008, there is an installed capacity of 76 megawatts (MW) of wind power in Romania, up from the seven MW installed capacity in 2007.[1] …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”