Brihanmumbai Storm Water Disposal System

Brihanmumbai Storm Water Disposal System

The "Brihanmumbai Stormwater Disposal System" is a project planned to overhaul Mumbai's water drainage system. The estimated budget for implementing the project is Rs. 1,200 crore (approx. 300 million US dollars) as of August 2005. Such a high-budget project would require funds from the Central Government.

The estimated time required to implement the project once funds are made available is 12 years. The project was originally meant to have completed in 2002.

The current drainage system in Mumbai, which was put in place at the beginning of the 20th century, is only capable of handling rain intensity of 25 mm per hour which is inadequate to meet present requirements. The system is also clogged at several places.

The project aims at enhancing the drainage system through larger diameter storm water drains and pipes, using pumps wherever necessary and removing encroachments. The intended increase in storm water carrying capacity is to 50 mm per hour.

The proposal was drawn by UK based consultants for the BMC in 1990 after the city had faced waterlogging at several places. At that time, the estimated cost of implementing the project was Rs. 616 crore but the BMC committee had rejected it on the grounds that it was "too costly".

"Storm water drains shouldn't be deeper than the Water Table", else at places near to sea like chedda nagar, water will accumulate in drains during high tide and be a source for breeding of mosquitos and other water born insects. When the mud is removed for drains, if the water table is near to top soil , water will accumulate in this ditch. Presently labourers use this water from the ditch to construct drains nearby! (cleaning the stones are OK). If water table is just below top soil, during high tide, water will wet top soil, this water comes from below soil and is not water backing up from sea.

External links

* [http://www.mcgm.gov.in/News/esr-execsum-eng.pdf Executive Summary of Environment Status Report of the Municipal Corporation of Greater Mumbai] , 2002-03 (PDF format) which states: "..."The present Storm Water Drainage system in the city is 70 years old and about 480 km in length. It is capable of handling rain intensity of 25 mm per hour at low tide.... One of the heavily polluted storm water drains which is known as Mithi River is responsible for polluting Mahim creek. BRIMSTOWAD is a project for the rehabilitation of city's SWD system.... The project... will cost Rs. 616 crore at 1992 price."
* http://mdmu.maharashtra.gov.in/pages/Mumbai/mumbaiplanShow.php - Government of Maharashtra's Department of Relief and Rehabilitation's "Mumbai plan" which says - "The present capacity of the storm-water drains needs to be augmented to a higher capacity which is under serious consideration with the Government of Maharashtra/BMC."
* [http://web.mid-day.com/news/city/2005/july/113574.htm "BMC project cost mounts to Rs 1,200 crore"] - Mid-Day article dated July 10, 2005


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • List of environmental topics (B) — This is a list of environmental topics. They relate to the effect of human activity on the environment.*B Reactor ( plutonium production reactor ) (in Washington state in the US) *Bachelor of Environmental Studies *Baku Tbilisi Ceyhan pipeline… …   Wikipedia

  • Sewage treatment — The objective of sewage treatment is to produce a disposable effluent without causing harm to the surrounding environment, and also prevent pollution.[1] Sewage treatment, or domestic wastewater treatment, is the process of removing contaminants… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”