Murulla rail accident

Murulla rail accident
Murulla rail accident
Murulla rail.jpg
Details
Date 13 September 1926
Location Murulla, New South Wales
224.9 km (139.7 mi) NNW from Sydney
Country Australia
Rail line Main North railway line, New South Wales
Operator N.S.W.G.R.
Type of incident Collision
Cause Runaway vehicles from goods train
Statistics
Trains 2
Deaths 26
Track layout

The Murulla rail accident involved the collision of the Sydney-bound Northwest Mail Train with runaway goods wagons near Murrurundi, New South Wales, in the Upper Hunter Valley on 13 September 1926. 26 persons lost their lives.[1]

A goods train had become divided and the attempts of the train crew to re-unite the portions resulted in 12 vehicles running away down a steep gradient, and colliding with the approaching mail train.

This was the worst accident on the New South Wales rail network until the Granville railway disaster in 1977.

Contents

The events

The signal box at Murulla controlled a loop line for trains to pass on a single line railway; there were no other connections at the location. Electric Train Staff operated between Wingen and Murulla and Electric Tablet operated between Murulla and Blandford.[1]

Train no 62, southbound goods train comprised a standard goods engine hauling 34 wagons and a brake van were to pass through Murulla on the main line. Another goods train, no 95, working in the opposing direction, had entered the loop line and was waiting for no 62 to pass. No 62 had a length of 951 feet (290 m) and a load of 746 tons (758 t). All vehicles were fitted with Westinghouse air brakes.

The train slowed at Murulla signalbox for the exchange of the single line tokens, and as the train staff for the onward section was received, the driver of no 62 put on steam. The shock resulted in the train becoming divided, with the rear twelve vehicles separating from the main train. This was later attributed to the failure of a drawhook. The division of the train was noticed by the driver and both portions of the train were safely brought to a stand.

Both portions of the train were verified to be within the clearance points of the loop line, so train no 95 was permitted to depart.

The detached portion of no 62 consisted of 12 vehicles, and its length 331 feet with a weight of 264 tons. Handbrakes were applied to these vehicles. It would appear that the train staff in the possession of the engine crew was returned to the instrument in the signal box at this time, and all vehicles were within the confines of the home signals.

After a number of attempts to fit a tailrope, the brakevan had been shunted back, foul of the clearance point for the loop line. The two opposing vehicles at the separation were finally hitched with a single wire rope connection, but the airbrake hoses could not be connected. The signalman then requested that the train be brought forward so that it was clear of the clearance point so as to permit the approaching southbound no 8 Mail train to pass through the loop.

The guard of no 62 released the handbrakes on the rear portion, leaving it unbraked and the driver went forward to his engine. When he started the train the tailrope broke and the rear portion began to run back down the grade towards Blandford, coming into collision with the approaching mail train just beyond the Up Distant signal. The collision resulted in the death of 26 persons.[1] (Gunn has 27 fatalities.)[2]

Coronial inquest

Following the disaster, a coronial inquest was held at Murrurundi, with evidence being taken over eight days. On 9 October 1926 the District Coroner committed the driver and guard of the goods train for trial. He noted that there was no pin in the train's guard's van to enable the two portions of the train to be coupled in accordance with regulations. Had the portions been properly coupled, the Westinghouse brake pipe hoses could have been connected so that in the event of a further break-away, the brakes on the rear portion would have been automatically applied. In the absence of that pin, essential principles of safe working had been overlooked.[3]

Criminal court proceedings

On 6 December, the Driver and Guard appeared at the Central Criminal Court, charged with feloniously slaying one of the Mail Train's passengers. The Crown Prosecutor alleged that if the accused failed to link up the air brakes when the appliances were there, they were guilty of gross negligence. [3]

In his summing up, Mr Justice Ferguson said the charge of manslaughter could be established only if the Crown proved gross negligence, criminal in character, and deserving of punishment. On 8 December, the two men were acquitted.[3]

References

  1. ^ a b c The Murulla Accident Singleton, C.C. Australian Railway Historical Society Bulletin, June, 1962 pp89-90
  2. ^ Along Parallel Lines - A History of the Railways of New South Wales, 1850 to 1986 Gunn, John. p387. Melbourne University Press, 1989, ISBN 0 522 84387 5.
  3. ^ a b c Australian Railway Disasters Pearce, Kenn IPL Books Davidson ISBN 0 908876 09 2


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • List of rail accidents (pre-1950) — For a list of 1950 1999 rail accidents, see List of 1950 1999 rail accidents.For a list of post 2000 rail accidents, see List of rail accidents. notoc Pre 1830 1815 * 1815, exact date unclear ndash; Philadelphia, Co Durham, England: 16 people,… …   Wikipedia

  • Armagh rail disaster — The Armagh rail disaster happened on 12 June 1889 near Armagh, Ireland. A crowded Sunday school excursion train had to negotiate a steep incline, but the steam locomotive was unable to complete the climb and the train stalled. The train crew… …   Wikipedia

  • Murrurundi, New South Wales — Location of Murrurundi in New South Wales (red) …   Wikipedia

  • Coupling (railway) — Knuckle (AAR Type E ) couplers in use ICE coupler A c …   Wikipedia

  • Burning Mountain — For the Alfred Coppel science fiction novel, see The Burning Mountain. For the Larry Niven fantasy novel Burning Mountain, see Larry Niven. Burning Mountain Mount Wingen …   Wikipedia

  • Main North railway line, New South Wales — For other railways called Main North Line, see Main North Line. For other railways called Great Northern, see Great Northern Railway. [v · d · …   Wikipedia

  • Newcastle and Central Coast railway line — Newcastle Central Coast line Mode Regional rail line Coach service Owner CityRail Operator(s) …   Wikipedia

  • Bus routes in Newcastle, New South Wales — Newcastle Mode Commuter bus Owner Ministry of Transport Operator(s) State Transit Connects N …   Wikipedia

  • Newcastle railway station, New South Wales — For the main railway station in Newcastle upon Tyne, England, see Newcastle railway station. Newcastle …   Wikipedia

  • South Maitland Railway — [v · East Greta No1 Tunnel Colliery coal loader Legend …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”